Environmental Projects | Permitting Portfolio | WHB Engineers https://whbengineers.com/projects/environmental-and-permitting/ Fri, 06 Mar 2026 23:48:43 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 https://whbengineers.com/wp-content/uploads/2023/11/cropped-WHB_favicon-32x32.png Environmental Projects | Permitting Portfolio | WHB Engineers https://whbengineers.com/projects/environmental-and-permitting/ 32 32 Laguna Beach School District – Water Quality Management Plan https://whbengineers.com/laguna-beach-school-district-water-quality-management-plan/ Mon, 05 Feb 2024 20:56:07 +0000 https://whbengineers.com/?p=3890 WHB Engineers was selected by a commercial compost facility to assist in compliance with the State of California Compost General Order (CGO).

The post Laguna Beach School District – Water Quality Management Plan appeared first on WHB Engineers.

]]>

Environmental & Permitting

WHB Engineers provides as-needed professional services as Qualified SWPPP Practitioner/Qualified SWPPP Developer (QSP/QSD) to support the existing, ongoing Water Quality Management Plan (WQMP) requirements for inspection and maintenance as approved by the County of Orange.

WHB has additionally reviewed the existing WQMP dated July 24, 2002 prepared by Fuscoe Engineering to help develop maintenance recommendations and processes such that LBUSD is in compliance with the approved WQMP. WHB has trained appropriate LBUSD team members on the implementation of the current WQMP.

Latest Projects

The post Laguna Beach School District – Water Quality Management Plan appeared first on WHB Engineers.

]]>
Evergreen Nursery Soil Percolation Testing https://whbengineers.com/evergreen-nursery-soil-percolation-testing/ Mon, 05 Feb 2024 20:51:32 +0000 https://whbengineers.com/?p=3878 WHB Engineers was selected by a commercial compost facility to assist in compliance with the State of California Compost General Order (CGO).

The post Evergreen Nursery Soil Percolation Testing appeared first on WHB Engineers.

]]>

Civil Engineering,  Environmental & Permitting

WHB Engineers was hired to author permit required documents (PRDs) for permit activation including a notice of intent (NOI) and Technical Report detailing site conditions. 

As part of the Technical Report, WHB conducted soil percolation testing and reporting of hydraulic soil surface conditions around active compost areas and detention basins. WHB was also responsible for creating and implementing a Groundwater Protection Monitoring Plan including the design, installation and monitoring of new onsite groundwater wells as well as existing site wells.

Latest Projects

The post Evergreen Nursery Soil Percolation Testing appeared first on WHB Engineers.

]]>
San Pasqual Valley Soils Groundwater Protection https://whbengineers.com/san-pasqual-valley-soils-groundwater-protection/ Wed, 24 Jan 2024 20:00:50 +0000 https://wordpress-984593-3995626.cloudwaysapps.com/?p=3552 WHB Engineers was selected by a commercial compost facility to assist in compliance with the State of California Compost General Order (CGO).

The post San Pasqual Valley Soils Groundwater Protection appeared first on WHB Engineers.

]]>

Civil Engineering,  Environmental & Permitting

WHB was selected by a commercial compost facility to assist in compliance with the State of California Compost General Order (CGO).

The scope of work included initial site testing of the surface soils and their hydraulic infiltration rates, ongoing groundwater monitoring, and permit preparation and submittal as required by the State Water Resources Control Board.

To comply with the California General Permit (CGP) requirements for a Tier II Facility, WHB prepared and implemented a Groundwater Protection Monitoring Plan (GPMP).

This included a review of the regulatory requirements for this type of facility and an examination of the geology and hydrogeology of the site.

Based on our findings, WHB implemented the design, installation, and development of two groundwater wells, and performed an elevation survey.

WHB’s Environmental Services Team then collected groundwater samples for laboratory analysis and calculation of hydrogeologic parameters. A Well Installation and Monitoring Report was delivered to the client and ultimately submitted to the regional water quality control board.

The outcome of this assessment will aid the facility in future management decisions and contribute to the long-term preservation of water quality in the San Pasqual Valley.

Latest Projects

The post San Pasqual Valley Soils Groundwater Protection appeared first on WHB Engineers.

]]>
Verizon Construction General Permit Compliance Program for Linear Construction https://whbengineers.com/verizon-construction-general-permit-compliance-program-for-linear-construction/ Thu, 28 Dec 2023 16:31:50 +0000 https://wordpress-984593-3995626.cloudwaysapps.com/?p=2456 Cox Construction's compliance program, aided by WHB Engineers , secured environmental permits for 14 miles of fiber conduit undergrounding in San Diego. WHB Engineers facilitated PRD preparation, inspections, and ongoing database management.

The post Verizon Construction General Permit Compliance Program for Linear Construction appeared first on WHB Engineers.

]]>

Contra Costa College

008 (Design) 2012 (Construction)

Services: Environmental & Permitting

WHB’s operating company to support Verizon’s general permit compliance. 

WHB supported Verizon in getting City of San Diego and State of California environmental permitting for 14 miles of customer-owned fiber conduit undergrounding in San Diego.

Permit Required Documents (PRDs) were prepared by a WHB Qualified SWPPP Developer and uploaded to the SMARTS database in collaboration with site owners.

The project has since obtained a State of California CGP for the LUP Type-1 project.

Each construction crew was trained by a WHB QSP to implement stormwater BMPs on their sites.

To date, WHB personnel have performed over 40 inspections and prepared and submitted two permit amendments. 

All PRDs are reviewed by the local municipality and the regional water quality control board for approval and permitting. 

WHB also provides ongoing SMARTS database management and quality control to support to Verizon Communication Inc. for this program.