Civil Engineering Projects | California Portfolio | WHB Engineers https://whbengineers.com/tag/civil-engineering/ Thu, 19 Jun 2025 00:25:30 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 https://whbengineers.com/wp-content/uploads/2023/11/cropped-WHB_favicon-32x32.png Civil Engineering Projects | California Portfolio | WHB Engineers https://whbengineers.com/tag/civil-engineering/ 32 32 Almond Grove Street Reconstruction https://whbengineers.com/almond-grove-street-reconstruction/ Thu, 28 Dec 2023 16:43:34 +0000 https://wordpress-984593-3995626.cloudwaysapps.com/?p=2469 WHB Engineers showcased expertise in Almond Grove Street Reconstruction, Los Gatos. Collaborating with the community, they revitalized eight streets, preserving the neighborhood's charm.

The post Almond Grove Street Reconstruction appeared first on WHB Engineers.

]]>

Civil Engineering, Surveying

WHB has an 80 year history of providing civil engineering services for public clients.  Our talented staff can take a project from preliminary design through engineering services support during construction.

One recent project is Phase 2 of the Almond Grove Street Reconstruction Project in Los Gatos, CA.  The scope of work included reconstruction of 8 intersecting streets within the quaint historic Almond Grove neighborhood adjacent to Los Gatos’ downtown hub.  The residents strongly desired to replace damaged concrete roads in kind with new concrete pavements in order to preserve the neighborhood’s character.

WHB lead a series of community meetings to inform residents of the design appearance and illustrate the impact on trees and neighborhood walkways.  We coordinated closely with subconsultants to prepare tree planting plans and a new jointed plain concrete pavement section that did not require steel reinforcement.  This design achieved our goal of increasing the tree canopy in Almond Grove while reducing environmental impacts and construction costs.

We also performed comprehensive topographic surveys of the project streets.  As part of the design, the streets were raised several inches to minimize construction impacts on existing shallow utilities.  WHB prepared detailed grading designs that ensured that the new streets’ improvements conformed to existing elevations at the back of sidewalk while also draining stormwater safely away from homes.  These designs were made possible by our survey and field evaluations by project engineers.

WHB provided steadfast engineering support to the Town during construction, which spanned 3 construction seasons and required intensive coordination with residents and stakeholders.

Latest Projects

The post Almond Grove Street Reconstruction appeared first on WHB Engineers.

]]>
Biotech Site Design https://whbengineers.com/biotech-site-design/ Thu, 28 Dec 2023 16:41:46 +0000 https://wordpress-984593-3995626.cloudwaysapps.com/?p=2464 Biotech Site Design offers Civil, Structural, and Electrical Engineering services. WHB Engineers is the Civil Engineer of Record for major biotech developments, including Kilroy Oyster Point. Projects involve landfill management, public improvements, and entitlements, showcasing expertise in creating cutting-edge life science spaces.

The post Biotech Site Design appeared first on WHB Engineers.

]]>

Civil Engineering, Structural Engineering, Electrical Engineering

WHB has had long-lasting relationships with many life science developers in the Bay area and is currently serving as the Civil Engineer of Record for multiple major biotech campus developments. 

One on-going project is the Kilroy Oyster Point development, which is a  public/private partnership development project located on an approximately 80-acre site at the end of Oyster Point Boulevard in South San Francisco.  The project includes the construction of 11 biotechnology research & development/office buildings, a hotel, a marina park, open space, three parking structures, new streets and utilities, a parking lot, a sanitary sewer pump station, Bay Trail, and other BCDC improvements and a public beach.

Roughly 50-acres of the project is underlain by landfill refuse and bay mud, with an existing engineered clay cap.  To make room for building foundations and a clean-soil utility corridor in the new street, refuse was relocated on site and a new clay cap installed.

In addition to the public improvements, WHB was involved in the entitlements process for the project, including the private Kilroy Oyster Point Phases 2-4 Precise Plan.  We provided the schematic plans for street design, grading, drainage, utilities, stormwater treatment, erosion control, fire access, and hydrant location.

In addition to Kilroy Oyster Point, WHB is also serving as the Civil Engineer of Record for the Shore in Brisbane, The Cove in South San Francisco, and a myriad of improvement projects on Genentech’s South San Francisco campus.  These campuses are seen in the photo below. We are proud to play a key role in creating new life science spaces that will provide health care for those in need.

Latest Projects

The post Biotech Site Design appeared first on WHB Engineers.

]]>
Otay Crossings Commerce Park Sewage Pump Station https://whbengineers.com/otay-crossings-commerce-park-sewage-pump-station/ Wed, 13 Dec 2023 22:02:55 +0000 https://wordpress-984593-3995626.cloudwaysapps.com/?p=1900 Otay Crossings Commerce Park's Sewage Pump Station, serving the East Otay Mesa's new development, features a 7700-gallon wet well, 15,000-gallon emergency storage, and advanced electrical and control systems by WHB Engineers.

The post Otay Crossings Commerce Park Sewage Pump Station appeared first on WHB Engineers.

]]>

County of San Diego

2016

Description: The Otay Crossings Commerce Park Sewage Pump Station will service the new Otay Crossing development located in East Otay Mesa. The lift station includes a 7700 gallon wet well with a 15,000 gallon emergency storage manhole and two 15 HP lift pumps each capable of 275 gpm of sewage flow.

WHB Engineers provided electrical and control systems design, including power, controls, site lighting, grounding, and maintaining County SCADA standards to maintain consistency across all facilities.